<div>What GAO Found In GAO's opinion, the Internal Revenue Service's (IRS) fiscal years 2021 and 2020 financial statements are fairly presented in all material respects, and although certain controls could be improved, IRS maintained, in all material respects, effective internal control over financial reporting as of September 30, 2021. GAO's tests of IRS's compliance with selected provisions of applicable laws, regulations, contracts, and grant agreements disclosed no instances of reportable noncompliance in fiscal year 2021. Limitations in the financial systems IRS uses to account for federal taxes receivable and other unpaid assessment balances, as well as other control deficiencies that led to errors in taxpayer accounts, continued to exist during fiscal year 2021.These control deficiencies affect IRS's ability to produce reliable financial statements without using significant compensating procedures. In addition, unresolved and newly identified information system security control deficiencies in such areas as access controls and configuration of security settings increased the risk of unauthorized access to, modification of, or disclosure of sensitive financial and taxpayer data and disruption of critical operations in fiscal year 2021. IRS continues to take steps to improve internal controls in these areas. However, the remaining deficiencies are significant enough to merit the attention of those charged with governance of IRS and therefore represent continuing significant deficiencies in internal control over financial reporting related to (1) unpaid assessments and (2) financial reporting systems. Continued management attention is essential to fully addressing these significant deficiencies. The Consolidated Appropriations Act, 2021, enacted in December 2020, and the American Rescue Plan Act of 2021, enacted in March 2021, as well as other COVID-19 pandemic relief laws, contained a number of provisions, including the second and third rounds of direct payments (i.e., economic impact payments) totaling over $569 billion in fiscal year 2021, for eligible individuals to address financial stress caused by the COVID-19 pandemic. As part of monitoring and oversight of the federal government's efforts to prepare for, respond to, and recover from the COVID-19 pandemic, GAO has issued a number of reports on federal agencies' implementation of COVID-19 pandemic relief laws, including reports providing information on, and recommendations to strengthen, IRS's implementation of the tax-related provisions. Similar to GAO's prior year findings for the processing of the first round of economic impact payments, GAO's work in fiscal year 2021 found that IRS faced challenges issuing the second and third rounds of payments to certain eligible recipients and preventing improper payments. In commenting on a draft of this report, IRS noted its intention to continue working to improve its internal controls. Why GAO Did This Study In accordance with the authority conferred by the Chief Financial Officers Act of 1990, as amended, and because of the significance of IRS's tax collections to the consolidated financial statements of the U.S. government, which GAO is required to audit, GAO annually audits IRS's financial statements to determine whether (1) the financial statements are fairly presented and (2) IRS management maintained effective internal control over financial reporting. GAO also tests IRS's compliance with selected provisions of applicable laws, regulations, contracts, and grant agreements. IRS's tax collection activities are significant to overall federal receipts, and the effectiveness of its financial management is of substantial interest to Congress and the nation's taxpayers. For more information, contact Dawn B. Simpson at (202) 512-3406 or simpsondb@gao.gov.</div>

What GAO Found

In GAO’s opinion, the Internal Revenue Service’s (IRS) fiscal years 2021 and 2020 financial statements are fairly presented in all material respects, and although certain controls could be improved, IRS maintained, in all material respects, effective internal control over financial reporting as of September 30, 2021. GAO’s tests of IRS’s compliance with selected provisions of applicable laws, regulations, contracts, and grant agreements disclosed no instances of reportable noncompliance in fiscal year 2021.

Limitations in the financial systems IRS uses to account for federal taxes receivable and other unpaid assessment balances, as well as other control deficiencies that led to errors in taxpayer accounts, continued to exist during fiscal year 2021.These control deficiencies affect IRS’s ability to produce reliable financial statements without using significant compensating procedures. In addition, unresolved and newly identified information system security control deficiencies in such areas as access controls and configuration of security settings increased the risk of unauthorized access to, modification of, or disclosure of sensitive financial and taxpayer data and disruption of critical operations in fiscal year 2021.

IRS continues to take steps to improve internal controls in these areas. However, the remaining deficiencies are significant enough to merit the attention of those charged with governance of IRS and therefore represent continuing significant deficiencies in internal control over financial reporting related to (1) unpaid assessments and (2) financial reporting systems. Continued management attention is essential to fully addressing these significant deficiencies.

The Consolidated Appropriations Act, 2021, enacted in December 2020, and the American Rescue Plan Act of 2021, enacted in March 2021, as well as other COVID-19 pandemic relief laws, contained a number of provisions, including the second and third rounds of direct payments (i.e., economic impact payments) totaling over $569 billion in fiscal year 2021, for eligible individuals to address financial stress caused by the COVID-19 pandemic. As part of monitoring and oversight of the federal government’s efforts to prepare for, respond to, and recover from the COVID-19 pandemic, GAO has issued a number of reports on federal agencies’ implementation of COVID-19 pandemic relief laws, including reports providing information on, and recommendations to strengthen, IRS’s implementation of the tax-related provisions. Similar to GAO’s prior year findings for the processing of the first round of economic impact payments, GAO’s work in fiscal year 2021 found that IRS faced challenges issuing the second and third rounds of payments to certain eligible recipients and preventing improper payments.

In commenting on a draft of this report, IRS noted its intention to continue working to improve its internal controls.

Why GAO Did This Study

In accordance with the authority conferred by the Chief Financial Officers Act of 1990, as amended, and because of the significance of IRS’s tax collections to the consolidated financial statements of the U.S. government, which GAO is required to audit, GAO annually audits IRS’s financial statements to determine whether (1) the financial statements are fairly presented and (2) IRS management maintained effective internal control over financial reporting. GAO also tests IRS’s compliance with selected provisions of applicable laws, regulations, contracts, and grant agreements.

IRS’s tax collection activities are significant to overall federal receipts, and the effectiveness of its financial management is of substantial interest to Congress and the nation’s taxpayers.

For more information, contact Dawn B. Simpson at (202) 512-3406 or simpsondb@gao.gov.

More from:

News Network

  • Deputy Secretary Biegun’s Meeting with the Bosnia and Herzegovina Presidency
    In Crime Control and Security News
    Office of the [Read More…]
  • Justice Department Settles with Massachusetts Storage Company for Unlawfully Auctioning Off Deployed Servicemember’s Possessions
    In Crime News
    The Justice Department reached an agreement today with PRTaylor Enterprises LLC, doing business as Father & Son Moving & Storage (Father & Son), to resolve allegations that it violated the Servicemembers Civil Relief Act (SCRA) by failing to obtain a court order before auctioning off the entire contents of a U.S. Air Force Technical Sergeant’s two storage units while he was deployed overseas.
    [Read More…]
  • American Contractor Sentenced for Theft of Government Equipment on U.S. Military Base in Afghanistan
    In Crime News
    An American military contractor was sentenced today to 51 months in prison for her role in a theft ring on a military installation in Kandahar, Afghanistan.
    [Read More…]
  • U.S. Announces Additional Humanitarian Assistance for the Tigray Crisis Response
    In Crime Control and Security News
    Antony J. Blinken, [Read More…]
  • 2018 Pacific Island Disasters: Federal Actions Helped Facilitate the Response, but FEMA Needs to Address Long-Term Recovery Challenges
    In U.S GAO News
    The Federal Emergency Management Agency (FEMA) took steps prior to the 2018 disasters in the Commonwealth of the Northern Mariana Islands (CNMI), Guam, and Hawaii to facilitate response in the region, where time and distance from the continental United States create unique challenges. For instance, FEMA increased the capacity of two Pacific-area supply distribution centers and helped develop area specific disaster response plans. FEMA and its federal partners, such as the Department of Defense (DOD), had varied response roles, which local officials in the CNMI, Guam, and Hawaii considered effective. For example, DOD provided temporary roof repair for disaster survivors in the CNMI. Damage from Typhoon Yutu in the Commonwealth of the Northern Mariana Islands (left) and the Kilauea Volcano Eruption in Hawaii (right) As of October 2020, FEMA obligated $877 million—more than 70 percent of which was for Individual and Public Assistance missions—following the 2018 disasters and made progress addressing some region specific challenges. However, FEMA has not fully addressed housing assistance issues in the CNMI. For example, it experienced delays implementing its Permanent Housing Construction program in the CNMI due to contracting shortfalls and lack of experienced staff. As of October 2020, only about 30 percent of homes were completed and returned to survivors. GAO found that these housing assistance challenges are consistent with lessons learned from prior FEMA missions in other remote areas of the U.S. Developing guidance that addresses lessons learned in the Permanent Housing Construction program could help streamline assistance to disaster survivors. GAO also identified delays in FEMA's obligation of Public Assistance program funds—used to repair or replace disaster-damaged public infrastructure such as utilities, roads, and schools—in the CNMI, Guam, and Hawaii. Specifically, on average, it took over a year for FEMA to approve funds for projects awarded after the 2018 disasters. FEMA and local officials identified potential reasons for the delays, including cost estimation challenges. FEMA established cost factors in the CNMI to account for higher construction costs, and GAO found that FEMA collects some data on the timeliness of individual steps in the process. However, FEMA has not analyzed the data to help identify causes of the delays, which could allow it to target solutions to address them. The CNMI, Guam, and Hawaii experienced an unprecedented number of natural disasters in 2018—including typhoons, earthquakes, mudslides, and volcanic eruptions. FEMA is the lead federal agency responsible for helping states and territories prepare for, respond to, and recover from natural disasters. Due to the remoteness of Hawaii and the Pacific territories, disaster response and recovery can be challenging. Title IX of the Additional Supplemental Appropriations for Disaster Relief Act of 2019 includes a provision for GAO to review FEMA's response and recovery efforts for 2018 natural disasters, including those in the Pacific region. This report examines (1) how FEMA and its federal partners prepared for and responded to the 2018 disasters in the CNMI, Guam, and Hawaii; and (2) the extent to which FEMA assisted the CNMI, Guam, and Hawaii in recovering from the 2018 natural disasters. GAO analyzed program documents, response plans, and data on FEMA obligations, expenditures, and grant process steps as of October 2020; interviewed federal, state, territorial, and local officials; and visited disaster-damaged areas in Hawaii. GAO is making four recommendations, including that FEMA (1) incorporate lessons learned into Permanent Housing Construction guidance; and (2) use performance data to identify and address inefficiencies in the Public Assistance program. The Department of Homeland Security concurred, and FEMA is taking actions in response. For more information, contact Chris Currie at (404) 679-1875 or curriec@gao.gov.
    [Read More…]
  • Fiscal Year 2013 Budget Request: U.S. Government Accountability Office
    In U.S GAO News
    This testimony discusses the U.S. Government Accountability Office’s (GAO) budget request for fiscal year (FY) 2013. GAO very much appreciates the confidence Congress has shown in the efforts to help support the Congress in carrying out its constitutional responsibilities and to help improve government performance and accountability for the benefit of the American people.GAO is requesting an appropriation of $526.2 million for FY 2013 to support a staffing level of 3,100. This funding level represents a modest increase of 2.9 percent over FY 2012, and is 5.4 percent below our FY 2010 level. The majority of the requested increase represents the first step in rebuilding our staff capacity to a level that will enable us to optimize the benefits we yield for the Congress and the nation.We have carefully reviewed every aspect of our operations from a zero base to identify opportunities to reduce costs without sacrificing the quality of our work and preserving our ability to assist the Congress in addressing the most important priorities facing the nation. However, given that staff costs now represent about 81 percent of our budget and the deep reductions already taken in our infrastructure programs, reducing the size of our workforce could not be avoided. By the end of FY 2012, for the first time in over 75 years, GAO’s staffing level will drop below 3,000 staff, resulting in a net reduction of 11 percent in our staff capacity, or 365 people, in only a 2-year period.GAO’s work directly contributes to improvements in a broad array of federal programs affecting Americans everywhere and remains one of the best investments across the federal government. With this committee’s support, in FY 2011, GAO provided assistance to every standing congressional committee and about 70 percent of their subcommittees. GAO issues hundreds of products annually in response to congressional requests and mandates. Our work yielded significant results across the government, including financial benefits of $45.7 billion—a return on investment of $81 for every dollar invested in GAO. Our findings and recommendations produce measurable financial benefits for the federal government, enabled through the actions of Congress and Executive Branch agencies, ultimately making funds available to reduce government expenditures, reallocate funds to more productive areas, or increase revenues.
    [Read More…]
  • Comoros Travel Advisory
    In Travel
    Reconsider travel to [Read More…]
  • Veterans Community Care Program: Improvements Needed to Help Ensure Timely Access to Care
    In U.S GAO News
    The Department of Veterans Affairs (VA) established an appointment scheduling process for the Veterans Community Care Program (VCCP) that allows up to 19 days to complete several steps from VA providers creating a referral to community care staff reviewing that referral. However, as the figure shows, VA has not specified the maximum amount of time veterans should have to wait to receive care through the program. GAO previously recommended in 2013 the need for an overall wait-time measure for veterans to receive care under a prior VA community care program. Subsequent to VA not implementing this recommendation, GAO again recommended in 2018 that VA establish an achievable wait-time goal as part of its new community care program (the VCCP). Potential Allowable Wait Time to Obtain Care through the Veterans Community Care Program Note: This figure illustrates potential allowable wait times in calendar days for eligible veterans who are referred to the VCCP through routine referrals (non-emergent), and have VA medical center staff—Referral Coordination Team (RCT) and community care staff (CC staff)—schedule the appointments on their behalf. VA has not yet implemented GAO's 2018 recommendation that VA establish an achievable wait-time goal. Under the VA MISSION Act, VA is assigned responsibility for ensuring that veterans' appointments are scheduled in a timely manner—an essential component of quality health care. Given VA's lack of action over the prior 7 years implementing wait-time goals for various community care programs, congressional action is warranted to help achieve timely health care for veterans. Regarding monitoring of the initial steps of the scheduling process, GAO found that VA is using metrics that are remnants from the previous community care program, which are inconsistent with the time frames established in the VCCP scheduling process. This limits VA's ability to determine the effectiveness of the VCCP and to identify areas for improvement. In June 2019, VA implemented its new community care program, the VCCP, as required by the VA MISSION Act of 2018. Under the VCCP, VAMC staff are responsible for community care appointment scheduling; their ability to execute this new responsibility has implications for veterans receiving community care in a timely manner. GAO was asked to review VCCP appointment scheduling. This report examines, among other issues, the VCCP appointment scheduling process VA established and VA's monitoring of that process. GAO reviewed documentation, such as scheduling policies, and referral data related to the VCCP and assessed VA's relevant processes. GAO conducted site visits to five VAMCs in the first region to transition to VA's new provider network, and interviewed VAMC staff and a non-generalizable sample of community providers receiving referrals from those VAMCs. GAO also interviewed VA and contractor officials. GAO recommends that Congress consider requiring VA to establish an overall wait-time measure for the VCCP. GAO is also making three recommendations to VA, including that it align its monitoring metrics with the VCCP appointment scheduling process. VA did not concur with one of GAO's recommendations related to aligning monitoring metrics to VCCP scheduling policy time frames. GAO continues to believe this recommendation is valid, as discussed in the report. For more information, contact Sharon M. Silas at (202) 512-7114 or silass@gao.gov.
    [Read More…]
  • Defense Logistics: Army Should Track Financial Benefits Realized from its Logistics Modernization Program
    In U.S GAO News
    What GAO FoundThe Army Materiel Command (AMC) is using the Logistics Modernization Program (LMP) Increment 1 to support its industrial operations, but additional development is necessary, according to the Army, because the current system does not support certain critical requirements, including enabling the Army to generate auditable financial statements by fiscal year 2017. Officials at the 14 AMC sites GAO visited stated that LMP provided the core functionality they needed to support their operations and that they are improving in their ability to use the system. Additionally, some sites have locally developed tools to augment LMP capabilities. Army officials stated that although LMP is functional, it currently does not support certain critical requirements that have emerged since its initial development, such as automatically tracking repair and manufacturing operations on the shop floor of depots and arsenals. In addition, according to Army officials, the current system will not enable the Army to generate auditable financial statements by 2017, the statutory deadline for this goal. Increment 2, which is estimated to cost $730 million through fiscal year 2026, is expected to address these shortcomings. The Army is in the process of developing Increment 2 and expects to complete fielding by September 2016.The use of LMP Increment 1 has provided the Army some benefits, but whether the system has delivered the expected financial benefits to date is unknown because AMC does not have a process for tracking financial benefits realized. Since its deployment, LMP has provided some benefits to the Army. For example, because LMP relies on accurate data to perform effectively and efficiently, the Army has made data accuracy a priority and improved the accuracy of its data by conducting data assessments, correcting data problems, and placing management emphasis on data accuracy. Additionally, the use of LMP has improved accountability for inventory stored at AMC depots, increased visibility over Army assets, and resulted in other efficiencies--such as providing faster access to information. AMC officials also stated that LMP has enabled them to develop and begin to implement a set of standardized, enterprise-wide performance measures to better assess the business operations of AMC sites. The officials stated that these performance measures, which were being used during AMC leadership reviews in June 2013, were necessary because the measures previously used to assess AMC performance were inadequate. However, the extent to which financial benefits have been realized from deploying LMP is unknown. The Army expected LMP to lead to over $750 million in financial benefits by fiscal year 2012 and eventually achieve more than two dollars in benefits for every dollar spent. Army officials told us that there currently is no accurate process in place to track financial benefits associated with LMP. Officials stated that the inability to quantify benefits from LMP-driven performance improvements was due in part to the fluctuations in AMC workload resulting from operations in Iraq and Afghanistan. The Army is in the process of developing a performance baseline for sites that will pilot Increment 2, and it intends to apply these metrics to other AMC sites before May 2015. Federal guidelines and standards outline the need for assessing whether the benefits expected from an investment are achieved. Without a process in place to track the financial benefits associated with LMP, the Army does not have a way to determine whether LMP's projected financial benefits are materializing.Why GAO Did This StudyLMP is an Army enterprise resource planning system that supports industrial operations conducted by AMC at its life cycle management commands and its maintenance, manufacturing, and storage sites. Increment 1 of LMP was fully deployed in October 2010, and the Army has spent approximately $1.4 billion on LMP through fiscal year 2012. In order to expand the system's capabilities, the Army plans to deploy a second increment of LMP. The life cycle cost for LMP Increment 1 and Increment 2, from fiscal year 2000 through 2026, is estimated to be over $4 billion. GAO was asked to evaluate AMC's use of LMP. This report assesses the extent to which (1) LMP supports AMC's industrial operations and (2) the Army has realized the expected benefits from deploying LMP. GAO reviewed Army documents regarding LMP usage and interviewed officials from AMC headquarters, the LMP product office, and 14 AMC sites that use LMP to conduct their operations.
    [Read More…]
  • Secretary Antony J. Blinken at the 2021 High-Level Pledging Event for the Humanitarian Crisis in Yemen
    In Crime Control and Security News
    Antony J. Blinken, [Read More…]
  • Secretary Blinken’s Meeting with Jordanian King Abdullah II
    In Crime Control and Security News
    Office of the [Read More…]
  • Black Hole Collision May Have Exploded With Light
    In Space
    In a first, astronomers [Read More…]
  • Updated – Secretary Pompeo’s Travel to India, Sri Lanka, Maldives, Indonesia, and Vietnam
    In Crime Control and Security News
    Morgan Ortagus, [Read More…]
  • Defense Science and Technology: Opportunities to Better Integrate Industry Independent Research and Development into DOD Planning
    In U.S GAO News
    Why This Matters Research and development (R&D) projects in high-tech areas like cybersecurity and biotechnology can help the U.S. military reassert its technological edge. Contractors decide what independent R&D projects to conduct and the Department of Defense (DOD) reimburses them about $4 billion-$5 billion annually. More information about those projects could help DOD guide its own R&D investments. Key Takeaways DOD does not know how contractors’ independent R&D projects fit into the department’s technology goals. As a result, DOD risks making decisions about its multi-billion dollar science and tech investments that could duplicate work or miss opportunities to fill in gaps that the contributions of private industry do not cover. DOD has a database of independent R&D projects, but it is not very useful for informing investment decisions because DOD does not obtain information in these and other areas: Priority. Contractors do not identify whether a project aligns with any of 10 modernization priorities. The department uses those priorities to make decisions about R&D investments. Cost. The database does not capture a project’s complete cost, which could help DOD understand cost implications of future related work. Innovation. The database does not include whether a project is a lower-risk, incremental development or a more innovative “disruptive” technology. Disruptive projects carry higher risk of failure but offer possible significant rewards in the long term. While DOD is not required to review independent R&D projects to understand how they support DOD’s priorities, GAO analysis showed 38 percent of industry projects aligned with DOD’s priorities. To help DOD better understand the scope and nature of independent projects, we recommend DOD determine whether to require additional information in the project database and review projects annually as part of its strategic planning process. DOD agreed with both recommendations. How GAO Did This Study We categorized a sample of completed projects from 2014–2018 by innovation type and analyzed projects completed in 2018 for alignment with DOD's modernization priorities. We also reviewed DOD policies on independent R&D and interviewed representatives from 10 defense contractors. For more information, contact Timothy J. DiNapoli at (202) 512-4841 or dinapolit@gao.gov.
    [Read More…]
  • Federalism: Opportunities Exist to Improve Coordination and Consultation with State and Local Governments
    In U.S GAO News
    Federal agencies' intergovernmental affairs activities advance agency objectives that require coordination with state and local governments. Most of the 24 Chief Financial Officers (CFO) Act agencies GAO surveyed reported undertaking similar information-sharing and coordination activities, such as serving as liaisons, conducting outreach, and hosting and attending events. The agencies GAO surveyed also reported taking varied approaches to structuring their intergovernmental affairs operations to conduct these activities. Of the 20 agencies with agency-wide intergovernmental affairs offices, half focused on intergovernmental affairs as their sole function while the other half included multiple functions, such as congressional or legislative affairs. How Agencies Organized Their Intergovernmental Affairs Operations Most agencies also reported that intergovernmental affairs activities and responsibilities were dispersed across their agencies. Regional and program offices perform intergovernmental affairs functions at some agencies, while others have an agency-wide office for them. Responsibilities for consulting with state and local governments under Executive Order (E.O.) 13132 also varied. The order requires that each federal agency designate an official to implement the order. Fourteen agencies reported having such an official; 10 did not report having one. Representatives from state and local associations GAO interviewed reported interacting with federal agency intergovernmental affairs offices for outreach and information-sharing purposes. They also cited coordination and consultation challenges, such as difficulty identifying intergovernmental affairs contacts, limited federal agency knowledge of state and local government, and inconsistent consultation on proposed regulations. The Office of Management and Budget (OMB) has primary responsibility for implementing E.O. 13132 and related implementation guidance, including a requirement for the designation of a federalism official. However, OMB could not identify any oversight steps it had taken to ensure federal agencies' designation of a federalism official consistent with its guidance for implementation of the executive order. Taking steps to ensure federal agencies' designation of a federalism official could help ensure that agencies have an accountable process in place for appropriately consulting with state and local governments. Federal programs fulfilling national goals in education, health care, transportation infrastructure, and homeland security, among other issues, are implemented through a complex partnership between federal, state, and local governments. E.O. 13132, Federalism, outlines principles and criteria to guide the formulation and implementation of policies and the appropriate division of responsibilities between levels of government. GAO was asked to review intergovernmental affairs activities at executive branch agencies. This report (1) identifies intergovernmental affairs offices' key responsibilities and activities at selected federal agencies and how these offices are organized, and (2) assesses state and local government officials' interaction with intergovernmental affairs offices, including their reported strengths and challenges. GAO examined relevant policies and executive orders and surveyed officials from the 24 CFO Act agencies. GAO also interviewed a nongeneralizable sample of individuals from 10 associations representing state and local government officials. GAO is recommending that OMB ensure that federal agencies implement its guidance on agency adherence to E.O. 13132 requirements, particularly related to designating a federalism official. OMB neither agreed nor disagreed with the recommendation. For more information, contact Michelle Sager at (202) 512-6806 or sagerm@gao.gov.
    [Read More…]
  • DRL FY20 IRF Promoting and Defending Religious Freedom Inclusive of Atheist, Humanist, Non-Practicing and Non-Affiliated Individuals
    In Human Health, Resources and Services
    Bureau of Democracy, [Read More…]
  • Overseas Contingency Operations: Comparison of the Department of Defense’s Overseas Contingency Operations Funding Requests for Fiscal Years 2010 and 2011
    In U.S GAO News
    Since the September 11, 2001, terrorist attacks, the Department of Defense (DOD) has been engaged in domestic and overseas military operations in support of overseas contingency operations (OCO). These operations include Operation Iraqi Freedom, which focuses principally on Iraq, and Operation Enduring Freedom, which focuses principally on Afghanistan, but also include operations in the Horn of Africa, the Philippines, and elsewhere. Obtaining an accurate picture of OCO costs is of critical importance given the need to evaluate trade-offs and make more effective use of defense dollars in light of the nation's long-term fiscal challenges. In the past, the GAO has reported on the need for DOD to become more disciplined in its approach to developing plans and budgets, including building more OCO costs into the base defense budget. In February 2009, the Office of Management and Budget (OMB), in coordination with the Office of the Secretary of Defense (OSD), developed new guidance for use when constructing the initial fiscal year 2010 OCO funding request that more narrowly defined what should be considered an OCO funding need. The guidance remained in effect for building the fiscal year 2010 OCO supplemental request and the fiscal year 2011 OCO budget request.Under the Comptroller General's authority, GAO evaluated: 1. The fiscal year 2011 OCO budget request by comparing it to the fiscal year 2010 OCO appropriation and the fiscal year 2010 OCO supplemental request. 2. The assumptions DOD used to create the fiscal year 2010 OCO supplemental request and the fiscal year 2011 OCO budget request. 3. The extent to which the assumptions used for creating the fiscal year 2010 OCO supplemental request and the fiscal year 2011 OCO budget request are sensitive to operational changes. 4. The extent to which DOD moved certain costs of ongoing contingency operations from its OCO budget request into its base budget request.
    [Read More…]
  • United States and United Kingdom Sign Civil Air Transport Agreement
    In Crime Control and Security News
    Office of the [Read More…]
  • Priority Open Recommendations: Department of Defense
    In U.S GAO News
    What GAO Found In May 2020, GAO identified 81 priority open recommendations for the Department of Defense (DOD). Since then, DOD has implemented 21 of those recommendations, leading to improvements in readiness rebuilding efforts, cybersecurity, and the Navy's force structure, among other areas. Additionally, GAO closed four priority recommendations related to DOD enterprise-wide business reform as unimplemented because the recommendations are no longer relevant. GAO also removed one priority recommendation related to acquisition oversight because it no longer warranted priority attention due to actions taken by the military departments. Thus, reducing the number of remaining priority open recommendations to 55. In July 2021, GAO identified 26 additional priority recommendations for DOD, bringing the total number to 81. These recommendations involve the following areas: acquisitions and contract management; rebuilding readiness and force structure; financial management; cybersecurity and the information environment; health care; driving enterprise-wide business reform; preventing sexual harassment; and strengthening diversity, equity and inclusion within DOD. DOD's continued attention to these issues could lead to further improvements in the department's operations. Why GAO Did This Study Priority open recommendations are GAO recommendations that warrant priority attention from heads of key departments or agencies because implementation may significantly improve government operations, for example, by realizing large dollar savings; eliminating mismanagement, fraud, and abuse; or making progress toward addressing a high-risk or fragmentation, overlap, or duplication issue. Since 2015, GAO has sent letters to selected agencies to highlight the importance of implementing such recommendations. For more information, contact Elizabeth Field at (202) 512-2775 or fielde1@gao.gov.
    [Read More…]
  • Secretary Antony J. Blinken and Israeli Alternate Prime Minister and Foreign Minister Yair Lapid Before Their Meeting
    In Crime Control and Security News
    Antony J. Blinken, [Read More…]
Network News © 2005 Area.Control.Network™ All rights reserved.